top of page
image.png

Client:
Private
Stage:
Stage 3

The client's aim is for this bijoux office in the garden of Millbrook Cottage to be free from fossil fuels, entirely self-sufficient and off-grid. 

 

Using local sources a micro-hydroelectric system will be installed, supported by a PV installation, to generate enough electricity to meet the small power and lighting needs, as well as the heating demand.

A grey water reed filtration system will be installed to filter the wastewater from the wash-hand basin/sink and shower. A black water compost tank system will be installed to process and filter the waste from the toilet. Rainwater will be collected via a rainfall pipe into a dedicated tank and pumped to serve the wash hand basin.

mstep has ensured that the client's low energy and sustainability objectives have been met. 

 

millbrook cottage
garden project 

Millbrookcottage.jpg
Screenshot 2023-03-27 at 12.43.38 am.png
Screenshot 2023-03-27 at 12.44.33 am.png

Courtesy/A Woodeson

bottom of page