top of page
image.png

millbrook cottage
garden project 

Location: England 

Value: £20K MEP 

Completion: TBC   

Services provided  

  • MEP design 

  • energy strategy 

The client's aim for this bijoux office in the garden of Millbrook Cottage is to be free from fossil fuels, entirely self-sufficient and off-grid. 

using local sources, a micro-hydroelectric system will be installed, supported by a PV installation, to generate enough electricity to meet the small power and lighting needs, as well as the heating demand. 

 

a grey water reed filtration system will be installed to filter the wastewater from the wash-hand basin/sink and shower. a black water compost tank system will be installed to process and filter the waste from the toilet. rainwater will be collected via a rainfall pipe into a dedicated tank and pumped to serve the wash hand basin. 

mstep has ensured that the client's low energy and sustainability objectives have been met.  

Image credit: A Woodeson

mstep is a registered company. Number 12830070.